L1 German 12T 14T 16T wheel stud bolt and nut

Short Description:

Small sign on hub bolt to keep away from rollover

It’s very dangerous for the wheel bolts to fall off when the truck is driving. For the heavy truck with more load, the sudden separation of the wheel when driving at high speed not only has a great potential safety hazard to the vehicle itself and destroys the normal driving posture and stability of the vehicle, but also brings more serious losses to other vehicles and personnel on the road. It’s important to know that the destructive power of the wheel that often weighs hundreds of pounds is not enough It’s quite big


Product Detail

Product Tags

Most of the reasons for the wheel falling off are due to the loose fastening bolts of the wheel. As the only accessory of fixed wheel and axle, many drivers neglect the daily inspection of it.

In order to solve the various hazards and accidents caused by the falling off wheels of large vehicles, the wheels of some dangerous goods transport vehicles at home and abroad will be equipped with this small accessory. With it, you can find the loose wheel bolts in a very short time and deal with them in time.

stud bolt and nut (1) stud bolt and nut (2) stud bolt and nut (3)

This is the fastening mark of the wheel bolt. Although it is just a small plastic part, it can effectively prevent the wheel bolt from falling off. Just fix it on the tightened bolt and adjust the direction of "pointer". If the bolt is loose, it will rotate with the bolt and make the "pointer" deviate from the original angle.

After installing the fastening mark, we can check whether the wheel bolts are loose at any time when the vehicle is not running. Compared with the wheel without fastening mark, it has higher warning, so that the loose bolts can be seen at a glance.

FAQ

Q1. What is your terms of packing?
A: Generally, goods are sealed in ploy bags and packed in cartons and pallet or wood cases.

Q2. What is your terms of payment?
A: T/T (deposit + balance before delivery). We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 25 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample for free charge if we have ready parts in stock, but the customers have to pay the courier cost.

Q7. How do you make our business long-term and good relationship?
A: We provide our clients with one-stop service, from specific component to final assembled products, solving various problem for different clients all over the world.


  • Previous:
  • Next:

  • Write your message here and send it to us